Size concrete pours for round cardboard forming tubes. Enter tube diameter, footing depth, and total pier count to get per-pier and project-wide bag quantities.
how many bags of concrete for 12 inch sonotube8 inch sonotube concrete volumedeck pier footing concrete calculator
Project Shopping & Prep Checklist
Bagged vs. Bulk Delivery Guide
Compare retail bags against bulk cubic-yard or pallet orders before heading to the supply yard.
- Small DIY Orders: Retail bags are easiest to transport in a sedan or SUV and store dry until pour day.
- Mid-to-Large Projects: Compare pallet pricing or bulk cubic-yard delivery once total volume exceeds 1.5–2.0 cubic yards.
Standard Sonotube Concrete Volume per 4-Foot Pier
| Tube Diameter | 4 ft Pier (cu ft) | 80lb Bags / Pier | 60lb Bags / Pier | Weight / Pier |
|---|---|---|---|---|
| 8 inches | 1.40 cu ft | 2.4 bags | 3.1 bags | 187 lbs |
| 10 inches | 2.18 cu ft | 3.7 bags | 4.9 bags | 291 lbs |
| 12 inches | 3.14 cu ft | 5.3 bags | 7.0 bags | 419 lbs |
| 16 inches | 5.59 cu ft | 9.4 bags | 12.5 bags | 745 lbs |
| 18 inches | 7.07 cu ft | 11.8 bags | 15.7 bags | 943 lbs |
Frequently Asked Questions
How deep do Sonotube footings need to be?
Deck and porch footings must extend below your local frost line—typically 36 to 48 inches in northern US states and Canada, or 12 to 24 inches in mild southern climates.
Should I pour the entire Sonotube in one lift?
Yes. Pouring continuously prevents cold joints. Tap the outside of the cardboard form or use a rebar rod to consolidate the mix and eliminate air pockets.
Do I leave the cardboard Sonotube in the ground?
Yes, below-grade cardboard forms can stay buried, though many builders peel off the top 2 to 4 inches exposed above grade for a cleaner architectural finish.